WWTP Updates November 2010

Aeration Basin 1 - November

November 4, 2010

Aeration Basin 2 - November

November 4, 2010

Holes had to be core drilled for the new piping.  Two openings in a mid-wall were poured creating two Aeration Basins that can function as one or two separate basins. Support walls were poured on both sides of the mid-wall that separates the two basins.

Aeration Basin 3 - November

November 4, 2010

Aeration Basin 4 - November

November 4, 2010